§ 42-6. Preapplication conference.  


Latest version.
  • (a)

    At the preapplication conference, the applicant may be represented by a land planner, engineer, surveyor or legal counsel.

    (b)

    The applicant should confer with the city manager prior to the preparation of a preliminary plat and discuss the procedure for obtaining approval of a subdivision plat and the requirements as to the general layout and arrangement of lots, blocks and streets, storm drainage, sewerage and water improvements. The city manager shall also advise the applicant, where appropriate, to discuss the proposed subdivision with those officials who must eventually approve those aspects of the subdivision plat coming within their jurisdiction.

    (c)

    At the request of the city manager, the subdivider shall submit a master or tentative plan for all the contiguous property owned or intended for development by the subdivider as required by the city manager. The plan shall show a proposed future street system and lot pattern sufficient for the city manager to review the proposed development for general compliance with respect to surrounding land use, street connections, utilities, drainage facilities and park and open greenspace needs.

(Ord. No. 05-1162, § 6, 3-28-2005; Ord. No. 15-1212, § 2(Exh. 1), 7-13-2015)